Problema Solution

A roofing contractor estimates that he can shingle a house in 20 h and that his assistant can do it in 30 h. How long will it take them to shingle the home working together?

I have to graph this, its the graph that helps you find the equation after, it doesn't really have a name. Thanks I will really appreciate it if you can help. Thanks

Answer provided by our tutors

A roofing contractor estimates that he can shingle a house in 20 h and that his assistant can do it in 30 h. How long will it take them to shingle the home working together?

Solution:

                       T = 1/[(1/20) + (1/30)] = 60/(3 + 2) = 12 H