Problema Solution
Detemine the labour constants in each ot the following case.
4 general workers can clear a site 912m^2 in area of vegetable matter, shrubs, etc in 57 hours
Answer provided by our tutors
given 4 general workers can clear a site 912m^2 in area of vegetable matter, shrubs, etc in 57 hours.... on an average each worker can clear 912/4 = 228....m2 area on an average of time = 57 hrs... so labour constants will be = 228a + 57 t