Problema Solution

A manufacturer makes two products A and B.Prodict A requires 30 minutes for processing,18 minutes for assembly and 24 minutes for packaging.Product B requires 12 minutes fo processing,72 minutes for assembly and 48 minutes for packaging.The plant has 6 hours for assembly, 4.8 hours for packaging and 4 hours for processing.If x is the nubmber of Product A manufactured and y is the number of Product B manufactured,determine the system of inequalities that best describe this situation

Answer provided by our tutors

A manufacturer makes two products A and B.Prodict A requires 30 minutes for processing,18 minutes for assembly and 24 minutes for packaging.Product B requires 12 minutes fo processing,72 minutes for assembly and 48 minutes for packaging.The plant has 6 hours for assembly, 4.8 hours for packaging and 4 hours for processing.If x is the nubmber of Product A manufactured and y is the number of Product B manufactured,determine the system of inequalities that best describe this situation

Solution:

The system of inequalities are below:

30x+12y <= 4*60

18x+72y <=6*60

24x+48y <= 4.8*60