Problema Solution

Sam and Bob both repair machines. Sam can repair one machine 5 hours faster than Bob can repair the same machine. If Bob and Sam both work on separate machines until Sam has completed his. Sam then takes over and finishes Bob's machine in 3 hours. Consider completing two machines as one job.

Answer provided by our tutors

Let x=hours needed for Bob to repair the machine

Bob works at the rate of 1/x machine per hour

Then x-5=hours needed for Sam to repair the machine

Sam works at the rate of 1/(x-5) machine per hour

In x-5 hours(1/(x-5))(x-5)=1) Sam completes his machine

In (1/x)(x-5) hours=(x-5)/x =amount of repair done by Bob in (x-5) hours, so:

1-(x-5)/x=(x-(x-5))/x=5/x amount of repair work yet to be done

So, now our final equation to solve is:

(1/(x-5))*3=5/x=

(Rate at which Sam works(1/(x-5)) times the amount of time he works(3 hours)equals the amount of work that he does (5/x))

3/(x-5)=5/x multiply each term by x(x-5)

3x=5(x-5) =

3x=5x-25 subtract 5x from each side

3x-5x=5x-5x-25

-2x=-25 divide each side by -2

x=12 1/2 hours------------------amount of time needed for Bob to repair a machine

x-5=(12 1/2)-5=7 1/2 hours------------amount of time needed for Sam to repair a machine

CK

In 7.5 hours (amount of time needed for Sam to complete his machine) Bob completes (1/12.5)*7.5=(7.5/12.5 )of a machine, leaving

12.5/12.5 -7.5/12.5=5/12.5 of a machine yet to be done

In 3 hours Sam completes (1/7.5)*3=3/7.5 of a machine

Now the question is does 3/7.5 = 5/12.5???? and the answer is yes!!! they both equal 0.4