Problema Solution

A certain mine yields low-grade oil shale containing 19.0 U.S. gallons of oil per ton of rock, and another mine has shale yielding 30.0 gal./ton. How many tons of each must be sent each day to a processing plant that processes 25000 tons of rock per day, so that the overall yield will be 22.0 gal./ton?

Answer provided by our tutors

let


x = the tones of the first 19 gal/ton mine

y = the tones of the second 30 gal/ton mine


25000 tons of rock per day are processed


x + y = 25000


the overall yield will be 22.0 gal./ton


19*x + 30y = 22*25000


by solving the system of equations


x + y = 25000

19*x + 30y = 22*25000


we find


x = 18,181.82 tons


y = 6,818.18 tons


click here to see the step by step solution of the system of equations


Click to see all the steps