Problema Solution

A man and his assistant can rake the sand on a beach volleyball court together in 24minutes. If his assistant could do it alone in 1hour, how many minutes would it take for the man to rake the court by himself?

Answer provided by our tutors

the rate of the assistant is 1/60 courts per min


the together rate is 1/24 courts per min


lets x = the minutes the man need to rake the court by himself thus his rate is 1/x courts per min


1/x + 1/60 = 1/24


by solving we find


x = 40 min


click here to see the step by step solution of the equation


Click to see all the steps



the man can do the job alone in 40 minutes.