Problema Solution

Working together, two people can cut a large lawn in 3 hr. One person can do the job alone in 1 hr less than the other. How long would it take the faster person to do the job?

Answer provided by our tutors

let


x = the hours the faster person needs to cut the lawn alone, x>0


1/x lawns per hour is the rate of the faster person


x + 1 = the hours the slower person need to cuth the lawn alone


1/(x + 1) lawns per hour is the rate of the slower person


1/3 is lawns per hour the together rate (they can cut the lawn together is 3 hours)


now we have:


1/x + 1/(x + 1) = 1/3


by solving we find:


x = 5.54 hr


click here to see the step by step solution of the equation:


Click to see all the steps



the faster person will do the job in 5.54 hours.