Problema Solution
A lineman can install 12 insulators in 18 3/4 hours,how many insulators can be installed in 28 1/8 hours?
Answer provided by our tutors
Answers 100% correct
he can install the12 insulators in 18 hours
A lineman can install 12 insulators in 18 3/4 hours,how many insulators can be installed in 28 1/8 hours?
Answers 100% correct
he can install the12 insulators in 18 hours