Problema Solution

Smith Engineering is in the process of reviewing the salaries of their surveyors.During this review, the company found that an experienced surveyor can survey a roadbed in 5 hours. An apprentice surveyor needs 11 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

Answer provided by our tutors

the company found that an experienced surveyor can survey a roadbed in 5 hours:


1/5 survey per hour the rate of the experienced surveyor


an apprentice surveyor needs 11 hours to survey the same stretch of road:


1/11 survey per hour the rate of the apprentice surveyor


let 'x' represent the number of hours the experienced surveyor and the apprentice surveyor need to complete the job together


1/x survey per hour the together rate


1/5 + 1/11 = 1/x


by solving we find:


x = 55/16


x = 3 7/16 hr


x = 3 hr 7*60/16 min


x = 3 hr 26 min 4*60/16 s


x = 3 hr 26 min 25 s


click here to see the step by step solution of the equation:


Click to see all the steps



they will need 3 hr 26 min 25 s to complete the job together.