Problema Solution

One machine can turn out 1000 pieces in 12 days. A second machine takes 18 days to turn out 1000 pieces. On a particular run the first mahcine is operated for 4 days alone. The second machine was then put into operation, and the two worked together. How long did it take to finish 1000 pieces?

Answer provided by our tutors

One machine can turn out 1000 pieces in 12 days.

A second machine takes 18 days to turn out 1000 pieces.

On a particular run the first machine operated for 4 days alone.

The second machine was then put into operation, and the two worked together.

How long did it take to finish 1000 pieces?

:

Let t = time that the two machines worked together

:

Let the completed job = 1 (1000 pieces made)

:

Mach 1 + Mach 2

+ = 1

Multiply eq by 26 to clear the denominators, results:

3(t+4) + 2t = 36

:

3t + 12 + 2t = 36

5t = 36 - 12

5t = 24

t =

t = 4.8 days working together to finish the job

:

:

Check this: (Machine 1 worked 8.8 days)

8.8/12 + 4.8/18 =

.733 + .267 = 1.0

confirms our solution of 4.8 days working together